Needs no Concrete Ring BeamIf the paving is securely laid, it is suitable for your Slidaway. The paving must be level to allow the building to slide freely and there must be a minimum of 300mm of concrete beneath the main fixing bolts. |
|
Home | Gallery | Planning Your Slidaway | Glide Rail | Concertina Doors | Easy Access | Fixing to the Ground | Aluminium Frame | No Concrete Ring Beam | Available Colours | Contact Us |